Deck Project Planner

Turn a rectangular deck layout into a priced purchase list for decking, common framing, fascia, fasteners, and footing concrete. Structural design remains with your approved plans.

Build your deck material plan

1 Deck layout
ft
Direction the decking boards run.
ft
ft
Used only in the project summary.
2 Decking boards
in
in
ft
%
$
boards
Add boards from your detailed layout.
3 Joists and rim boards
This is a material takeoff, not structural design. Confirm species, spans, joist size, beams, posts, ledger, connections, and local code with approved plans.
in
ft
$
%
ft
$
4 Finishing and footings
ft
ft
$
each
each
$
footings
bags
$

Deck material order

A store-ready summary based on your layout, approved framing plan, and local prices.

Advertisement space reserved for future ad network

From deck dimensions to purchasable boards

The planner calculates full deck-board rows across the width, boards required along each row, and an allowance for cuts and defects. This produces a more useful retail count than square footage alone. Add picture-frame borders, breaker boards, stairs, and unusual patterns in the extra-board field.

How the common framing takeoff works

Joist count is based on the entered on-center spacing along the deck length. Each joist spans the entered deck width and is converted to the selected stock length. Rim-board material covers both ends of those joists. This does not size members or calculate beams, posts, a ledger, blocking, hardware, or lateral-load connections.

Footings come from the approved plan

The planner deliberately does not invent a footing count. Enter the number and concrete per footing from your approved design. Diameter, depth, frost line, soil, loads, and local code determine the actual requirement.

Before purchasing

  • Confirm actual board dimensions, stock lengths, and manufacturer spacing rules.
  • Confirm span tables and the complete framing plan with your local building authority or qualified designer.
  • Add beams, posts, ledger material, joist hangers, structural fasteners, flashing, railings, stairs, permits, delivery, and tax separately.
  • Locate utilities and confirm excavation requirements before digging.